ENVIRONMENTAL REMEDIATATION & SITE PREPARATION EXPERTS
40+ years delivering asbestos abatement, soil remediation, UST removal, selective demolition, excavation, site preparation for public and private sector clients.
40+ years delivering asbestos abatement, soil remediation, UST removal, selective demolition, excavation, site preparation for public and private sector clients.
Asbestos abatement is the highly regulated process of identifying, safely removing, repairing, or encapsulating (sealing) asbestos-containing materials (ACMs) in buildings to prevent toxic fiber release. It is handled by licensed professionals to manage risks from materials like pipe insulation, tiles, or spray-on fireproofing.
Soil remediation is the process of removing, reducing, or neutralizing pollutants—such as heavy metals, petroleum products, or pesticides—from contaminated soil to restore it to a safe, usable state. It mitigates environmental and health risks caused by industrial activities, spills, or improper waste disposal.
Excavation and site preparation is the critical initial phase of construction that transforms raw land into a stable, building-ready site. It consists of clearing, leveling, and digging the earth to meet engineering specs, ensuring a safe, firm foundation for the future structure.
Underground Storage Tank (UST) removal and closure is the regulated process of permanently decommissioning a tank—usually by digging it up (removal) or filling it with inert material (in-place closure)—to eliminate environmental and safety risks from potential petroleum leaks. This process requires hiring licensed professionals to remove residual products, clean the tank, test surrounding soil for contamination, and file official closure reports with environmental agencies.
Selective demolition is a precise, "surgical" process of removing specific parts of a structure—such as interior walls, floors, or mechanical systems—while keeping the surrounding areas intact. It focuses on maximizing efficiency for renovations or adaptive reuse, allowing for the salvage and recycling of materials like steel, wood, and concrete.

Tecnica safely removed 44,000 tons of contaminated soil and handled unexpected UST discoveries on a very tight deadline. Their project management and field crews delivered exactly what they promised.

Their crews understand the complexities of working in active industrial environments. They removed 15,000 tons of contaminated soil without disrupting our daily production schedule.

Tecnica's ability to manage complex abatement while keeping our construction schedules on track is unmatched. They maintained zero safety incidents on the massive Old Main Post Office redevelopment.

Tecnica handled our UST removal professionally from start to finish. Their deep knowledge of Illinois environmental regulations saved us time and prevented costly compliance issues.

Tecnica handled everything from pavement removal to UST closure for our Joliet property. The project came in on budget and two weeks ahead of schedule—their 30 years of experience really shows.

Tecnica completed asbestos abatement at three of our schools over the summer and finished ahead of schedule. Their strict safety protocols gave us complete peace of mind.

Tecnica Environmental Services has built a reputation for delivering complex environmental and site contracting projects safely, efficiently, and on schedule. Our combination of experienced field crews, regulatory expertise, and responsive project management makes us a trusted partner across Illinois and the Midwest.
Every project is approached with hazard awareness, trained crews, proper PPE, and compliance-focused field execution.
From abatement crews to operators and laborers, Tecnica brings practical field experience to difficult project conditions.
Tecnica understands the documentation, disposal, manifesting, containment, and regulatory requirements that environmental work demands
We understand bid deadlines, phasing, coordination with other trades, and the pressure to keep construction schedules moving.

